File:Into main bearing supply channel.jpg

From Citroen SM Wiki
Original file(2,272 × 1,704 pixels, file size: 1.15 MB, MIME type: image/jpeg)

Primary timing chain new oil squirt hole. Drill a 0.5mm (.020") hole into the oil passage from the main bearing to the intermediate shaft ( hole is in the center of the white circle on the oil passage). Align the hole about 15 degrees above horizontal and toward the center of the chain travel, or approximately 45-50 degrees off the crankshaft center line toward the primary chain. By: Richard Batchelor

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current03:59, 15 August 2008Thumbnail for version as of 03:59, 15 August 20082,272 × 1,704 (1.15 MB)Richard (talk | contribs)Primary timing chain new oil squirt hole. Drill a 0.5mm (.020") hole into the oil passage from the main bearing to the intermediate shaft ( hole is in the center of the white circle on the oil passage). Align the hole about 15 degrees above horizontal and
  • You cannot overwrite this file.

The following page links to this file:

Metadata